Site visit - Check Power Pole Issue

Image
Arrived at site around 12:30, onsite to look at Power Pole clearing issue and Phone line location. Looked at Survey points that Contractor had questions. Contractor is working on taking out old structure and getting Rip Rap in place at water. This pic is to show trees that are in the way to install powerline.  

Demolition Site Visit

Image
  Contractor had removed the deck, was working on cutting bolts and lifting out beams. Traffic Control was in place on south side, signs were moved out of the way on the north side to allow equipment through, but will be replaced at end of work day Labor posters were displayed prominently